Bags or Bulk

Calculators / Pavers

Plus base and sand

Paver calculator

Paver count for any shape, plus the two materials people forget to price: the compacted gravel base and the one-inch sand bed.

4 in of compacted base minimumExactly 1 in of bedding sand5–10% extra for cuts
AD SLOT — see README to enable AdSense

Measurements

Add as many areas as you need — they are totalled.
Add your local prices

Nothing you type leaves your browser. Prices are used only to work out which way of buying is cheaper.

PAVERS Order ticket
AD SLOT — see README to enable AdSense

Sizes and allowances

OptionFigureNotes
Walkway, foot traffic4 in baseCompacted crushed stone in two 2-inch lifts.
Patio4–6 in baseSix inches on clay or poorly drained soil.
Driveway8–12 in basePlus a thicker paver. This is a different job from a patio.
Bedding sand1 inScreeded and never compacted before laying. Not a levelling layer.
Cutting waste5–10%Five percent for a rectangle, ten where there are curves or angles.

Three materials, not one

The paver count is the easy part. Underneath sits 4 to 6 inches of compacted crushed stone and a screeded 1-inch sand bed, and both of those are calculated above from the same area you entered.

The base extends past the paver edge by about 6 inches on every side so the perimeter has something to sit on. That is not included in the figures here — add it to your area if your layout is small enough for it to matter.

One inch of sand, no more

Bedding sand is not for levelling. It is a thin, uniform screeded layer that lets each paver seat evenly. Using sand to correct dips in a bad base is the single most reliable way to get a wavy patio within a year.

Get the base flat and properly compacted, then screed exactly an inch of coarse concrete sand across it. If you find yourself pouring 3 inches of sand into a low spot, stop and fix the base.

AD SLOT — see README to enable AdSense

Joint sand and edging finish the job

After laying, sweep polymeric sand into the joints and compact the surface. Without it, joints wash out and pavers start to wander.

Edge restraint spiked into the base holds the perimeter. A patio without restraint spreads at the edges, opens up joints, and fails from the outside in — and the fix is relaying it.

Common questions

How many pavers do I need?

Divide the area by the coverage of one paver. A 12 by 12 inch paver covers 1 square foot, so a 200 square foot patio needs 200 pavers plus 5 to 10 percent for cuts.

How much base do I need under pavers?

Four inches of compacted crushed stone for a walkway or patio, six on poorly drained soil, and 8 to 12 inches for a driveway. Compact in 2-inch lifts.

How much sand goes under pavers?

One inch of coarse concrete sand, screeded level. One cubic yard covers about 324 square feet at that depth.

How much extra should I order for cuts?

Five percent for a simple rectangle, ten percent where there are curves, angles or obstacles to work around.

Other calculators

Mulch · Gravel · Pea gravel · River rock · Topsoil